CHILDREN'S HOSPITAL OF WISCONSIN
Milwaukee, WI
The Challenge
System redundancy required
Limited space for the new units
Narrow pathway to bring units in
Equipment reliability
The Solution
Required system redundancy attained with FANWALL TECHNOLOGY
FANWALL TECHNOLOGY allowed for the smaller footprint required for the units to fit in the tight mechanical space
Knock-down unit construction permitted the sections to be brought into the mechanical room through the standard size freight elevator and hallways
Factory support throughout the design process ensured everyone’s expectations were met.
On-site factory technicians assisting the contractor ensured the units were field assembled correctly and quickly.
The Results
“I wanted to thank Vyron and all the Ventrol employees for your assistance in making the assembly of the air handling equipment successful. As we work towards start up in late September we will lean on Vyron to assist in the commissioning process.
A special thank you to René Deslauriers (Ventrol Technical Director) for his help in directing the erection of the units.”
– Dan Jasicki, Total Mechanical
Vyron Sales Engineer
Robert Feind
Engineer
Ring & DuChateau, LLP Milwaukee, WI
Contractor
Total Mechanical Pewaukee, WI