CHILDREN'S HOSPITAL OF WISCONSIN

Milwaukee, WI

The Challenge

  • System redundancy required

  • Limited space for the new units

  • Narrow pathway to bring units in

  • Equipment reliability

The Solution

  • Required system redundancy attained with FANWALL TECHNOLOGY

  • FANWALL TECHNOLOGY allowed for the smaller footprint required for the units to fit in the tight mechanical space

  • Knock-down unit construction permitted the sections to be brought into the mechanical room through the standard size freight elevator and hallways

  • Factory support throughout the design process ensured everyone’s expectations were met.

  • On-site factory technicians assisting the contractor ensured the units were field assembled correctly and quickly.

The Results

“I wanted to thank Vyron and all the Ventrol employees for your assistance in making the assembly of the air handling equipment successful. As we work towards start up in late September we will lean on Vyron to assist in the commissioning process.


A special thank you to René Deslauriers (Ventrol Technical Director) for his help in directing the erection of the units.”

– Dan Jasicki, Total Mechanical

Vyron Sales Engineer

Robert Feind

Engineer

Ring & DuChateau, LLP Milwaukee, WI

Contractor

Total Mechanical Pewaukee, WI